Up Pitts S1-SS Construction Gallery » 2005 » September 2005

DSCN0905
Welding the ribs onto the fin
DSCN0909
Welding the tailpost in.
DSCN0917
The fin is complete!
DSCN0919
The vertical fin.
DSC00786
DSC00787
DSC00788
Checking the offset carefully.
DSC00789
1/2" offset.
DSC00791
1/2" offset.
Picture 001
Welding of the fin ribs.
Picture 002
Welding of the fin ribs.
Picture 003
Welding of the fin top
Picture 004
Welding of the fin ribs.
Picture 007
Welding of the fin ribs.
Picture 008
Picture 010
Picture 009
Bottom of tailpost.
Picture 012
Spring gear longeron sleeves.
Picture 011
Me.
Picture 015
Spring gear longeron sleeves.
Picture 013
Spring gear longeron sleeves.
Picture 016
Spring gear longeron sleeves.
Picture 017
Picture 018
Extra tubing for spring gear.
Picture 019
Extra tubing for spring gear.
Picture 020
Extra tubing for spring gear.
Picture 021
Extra tubing for spring gear.
Picture 024
Tube crossover.
Picture 025
Air compressor. 1st of many.
Picture 026
My hand held chop saw.
Picture 027
Bench grinder.
Picture 028
Picture 029
For the inside of the tubing.
Picture 032
Extra tubing for spring gear.
Picture 035
Notch for crossover.
Picture 034
Sheet steel fopr the ribs.
DSC00860
DSC00861
DSC00867
DSC00871
DSC00872
DSC00873
DSC00875
DSC00876
DSC00877
DSC00880
DSC00881
DSC00882
Dean trying to look cool.
DSC00884
DSC00885
Welding on the support ladder.
DSC00886
DSCN0955
Spring gear supports welded!

52 Images | Create web photo albums with Jalbum | Chameleon skin | Help