Pitts S1-SS Construction Gallery
»
2009
» September 2009
DSC01028 1024
DSC01029 1024
DSC01032 1024
DSC01033 1024
Wiring through the firewall. Left is CHT/EGT, and right...
Wiring through the firewall starting to get busy.
Final shot of the wired up instrument panel.
Finakl wiring - left side.
Final wiring right side.
Final wiring of the lamps.
Tubing attached to the altimeter.
Starting toewire up the connections between the...
Main power bus.
Instrument ground bus.
Instrument panel bus on the circuit breakers.
Red RTV sealed behind the bulkhead bracket for the oil...
Inside of oil breather tube.
FInal solenoid wiring.
Final solenoid wiring.
Panel as it looks now with the the circiuot breakes,...
Wire bundles through the firewall.
Final arrangement of wires against the panel.
Wires running from panel to firewall.
Wires running from panel to firewall.
Wires running from panel to firewall, and down to the...
Wires running from panel to firewall.
Wires running from panel to firewall.
Wires running from panel down to ground bus. Thin wire is...
Wires running from panel down to ground bus. Thin wire is...
This is the fuel pump cover I made.
This is the fuel pump cover I made.
Test installation of the fuel pump cover.
Test installation of the fuel pump cover.
Installation of the fuel pump cover.
Installation of the fuel pump cover.
Installation of the fuel pump cover.
DSC01079
DSC01080
DSC01081
DSC01082
DSC01084
Inside view of new stack.
Trial fitting of new stack. Wide border looks much neater...
Side panel clamped in place with lightening holes.
Sidew panels took a long time to drill!
DSC01090
DSC01091
DSC01092
DSC01093
DSC01094
50
Images | Create
web photo albums
with
Jalbum
|
Chameleon
skin |
Help