Pitts S1-SS Construction Gallery
»
2010
» August 2010
Reassembling the magneto.
Casey, showing off the insides of magneto.
Closeup of the impulse coupling (on the right) - hardly...
Impulse coupler.. very clever mechanical device to delay...
The drivewheel cog thingy.. also looks in good nick, but...
Setting the timing of the mags
Setting the timing of the mags
Checking the firing of the spark plugs on the bench test.
The bench test machine, with my magneto sticking out of...
One inspected and operational dual mag - released to...
Setting up the measuring equipment to runout the crank...
Setting up the measuring equipment to runout the crank...
Setting up the measuring equipment to runout the crank...
Flange closeup
Flange
Gary noting all the measurements
MMMMMmmmmm... is that .007 ? ? ?
Cylinders after complete sandblasting.
Cylinders after complete sandblasting.
Rotec TBI arrived!
20